SNP / PRODUCTION & QUALITY

PRODUCTION & QUALITY

FROM APPROVAL TO PACKED ORDER

APPROVAL SETS THE PRODUCTION STANDARD.

Once a sample is approved, the job changes: from developing the product to protecting the approved standard through production, finishing, quality control and packing.

  1. 01

    MATERIALS & COMPONENTS

  2. 02

    PRODUCTION

  3. 03

    PLATING & FINISHING

  4. 04

    EARLY PRODUCTION

  5. 05

    INLINE QC

  6. 06

    FINAL QC

  7. 07

    PACKING

01 / Materials & Components

THE PARTS BECOME
THE PRODUCT.

Materials and components are checked against the approved reference and agreed construction.

BASE MATERIALS

Brass · Zinc alloy · Steel · Stainless steel

CHAINS & DECORATION

Chain · Stone · Pearl · Bead

FINDINGS & CONNECTIONS

Clasps · Jump rings · Posts · Extenders

The selected material and component specification depends on the product. Commodity reference prices do not determine a finished supplier price.

SEE MATERIAL & METAL TRENDS
Hands-on jewellery assembly and product work at SNP
Making, assembly and product detail.

02 / Production

MAKE THE CONSTRUCTION
WORK IN BULK.

Casting, chain and component assembly, soldering, stone setting and hand assembly each require a suitable production route.

We make directly where it fits the product and work with specialist production partners where their process is stronger.

The approved sample and specification remain the reference for materials, construction, finish and function.

03 / Plating & Finishing

PLATING IS NOT
JUST COLOR.

Surface preparation, plating process, color consistency and finishing all affect the final result.

Actual footage from a specialist processing partner, recorded by SNP. Two minutes from surface preparation through plating to protective coating, with original workshop sound and short English captions.
SHARE THIS VIDEO
EMAIL DRAFT

  1. 01

    SURFACE PREPARATION

  2. 02

    PLATING

  3. 03

    COLOR & FINISH

  4. 04

    INSPECTION

Selected real process footage, not a chemical recipe or proof that every order follows an identical route. The finishing specification is agreed for each product.

04 / Early Production

THE FIRST HOURS MATTER.

Problems found early can still be corrected. A problem first found at final inspection may already be repeated across an order.

  1. 01

    APPROVED SAMPLE

    Sets the reference.

  2. 02

    FIRST PRODUCTION

    Uses actual production materials.

  3. 03

    CHECK

    Color, construction, components, size, plating and appearance.

  4. 04

    CORRECT EARLY

    Act while correction is practical.

05 / Inline Quality Control

CHECK WHILE THERE IS
STILL TIME TO CORRECT.

CONSTRUCTION
Jump rings · Soldering · Clasps
FINISH
Plating · Surface · Glue · Stone alignment
SIZE
Length · Fit · Proportion
FUNCTION
Closures · Moving parts · Connections
OPEN JEWELLERY QC FIELD GUIDE
Real jewellery edge and high-contact surface inspection reference
Edges and high-contact areas deserve the same attention as the front surface.

06 / Final QC

CONFIRM THE ORDER AGAINST
THE APPROVED STANDARD.

Final inspection confirms that the finished order still meets the agreed standard. It should not be the first time quality is checked.

Appearance · Construction · Size · Function · Quantity & assortment · Packing readiness

Inspection points, testing requirements and acceptance criteria depend on the product, buyer specification and target market.

APPROVAL SETS THE PRODUCTION STANDARD.

De-identified jewellery carding and packing reference
Correct positioning protects the product and keeps presentation consistent through delivery.

07 / Packing

PACKING IS PART
OF QUALITY.

A product can leave production correctly and still arrive damaged, tangled or poorly presented if packing is wrong.

Carding · Chain securing · Post protection · Surface protection · Anti-tangle handling · Fragile-item protection · Transit protection · Final presentation

Confirm packaging, labels, quantities and destination details, then coordinate the agreed shipment handover.

SEE PACKING & RETAIL READINESS

From approval to packed order

ONE ORDER.
ONE STANDARD.

Approval → Production → Plating → Early / Inline QC → Final QC → Packing

WE SOLVE WHAT WE CAN INTERNALLY. WE INVOLVE THE BUYER WHEN THEIR DECISION IS GENUINELY NEEDED.

Pass SNP to a colleague.

WeChat

Sprite Chong

+86 186 6981 3965

English · Chinese · Korean